|
|
|
||||||||||||||||||||||||||||||||||||||||||
(splines= 1.375 x 16) |
Slip Stub Calculations (determine slip potential and effective length) |
|
|
|
||||||||||||||||||||||||||||||||||||||||||
(splines= 1.375 x 16) |
Slip & Stub "closed"= 7.938 | Slip & Stub "mid-slip" = 9.469 |
Slip & Stub "extended" = 11 |
---|---|---|
Total Parts "closed"= 9.626 | Total Parts "mid-slip" = 11.157 |
|
Tube Cut "mid-slip" = 12.843 |
||
Actual Travel = 3.062 |